Course U1/S400 (Remote) – Plant iT / brewmaxx

Liqu iT Training for Operators based on S7-400

Online registration:
Please select one of the available dates and click the red "Sign up now"-button next to it. You will be forwarded to the registration form. Should you have any questions regarding registration you can contact us: +49 9132 777 0.

Date Language Location Status Registration
06/10/25 - 06/13/25 English Remote
Sign up now
07/14/25 - 07/15/25 English Remote
Sign up now
10/13/25 - 10/16/25 English Remote
Sign up now

Legend: Booked upFew seats leftSeats available

Price per Person:
2.000,00 €

Duration:
2 days

NOTE:
10.06. - 13.06.2025
13.10. - 16.10.2025
are four half days - training hours 1 pm to 5 pm CET!

Description:

The course is an introduction to the operation of plants with the Plant Liqu iT and brewmaxx process control system.

The training will be held remotely via MS Teams.
Participants will be able to access our training system via Apache Guacamole VPN.

Target: 
After the training, the participants are able to operate Plant iT with Operation Manager.

Prerequisite:
None

Limitations:
The training takes place on a training system using a neutral example plant. This system has no direct technological connection to the participants' system. Only the operation of the standard Plant Liqu iT functionality is trained. Project-specific solutions for the participants' plants will not be trained.

Contents: 

  • System overview
  • Plant iT – Operation Manager
    • Structure: Sidebar, Frame color, Process areas, Structure sidebar
    • Fade in and out and expand, Displayed information depending on operator role
    • Operation, collective status, area filter, navigation in process screens, zoom, search, manual operation
    • Show and hide pop-ups and labels
  • Trending operating dialogs, various options for opening the dialogs Search for status information and parameters
  • The most important automation classes: DCM, DSV, MC, AI, AO, PIDC, SNM, FCN, LOGIC, BIM, Manual operation, Simulation, Locking, Error
  • Operation Tabs: Drag to new screen, Dashboard, Search, Area filter for errors, Access to manuals from the Operation Manager
  • Operation of message system: Sorting, Show and hide columns, Hit list, Jump to object, Jump to process screen, Comments on the message, Graphical analysis
  • Operating measured value curves
  • Sequence Controller dialog: operation Check Transitions, Change parameters, Change parameters for future steps, Designation of parameters (partial procedure Parameter Procedure Parameter etc.), Search for parameters
  • Object Control Matrixes (OCM): Operation, Analysis, OCM-Error
  • Order list
  • Step logs
  • FIFO and SU dialog
  • “REM Status” dialog
  • Procedures, recipes, materials and their parameters, What can be replaced where.
     

Back